Need Shop Drawings quote for the following Project.
The scope of work includes:
5.-07210 – Thermal Insulation
6.-07521 – SBS Modified Bituminous Membrane Roofing
7.-07710 – Roof Specialties
8.-07920 – Joint Sealants
Subcontractor to provide walkway pads as required by contract documents.
17.Subcontractor will provide daily protection of the roofing at the end of each shift.
18.Subcontractor to provide a new Styrene-butadiene-styrene (SBS) modified bituminous membrane roofing system as approved by owner on concrete deck including but not limited to:
a.All wood blocking required to complete roofing system.
b.All means of access and logistics for our work.
c.Fully adhere 2" Iso Base layer, and full ¼" tapered Iso (Min R11 – Min Avg R39)
d.Fully adhere ¼" Dens Deck Cover Board.
e.Fully adhere 2 Plies of Tremco’s PowerPly Endure 300 SBS Modified Bitumen System, granulated Cap Ply. Per RFI #59
f.Flash parapets with Tremco’s reinforced Alpha Guard Bio system.
g.Shop fabricate, and install all aluminum coping, counterflashing, scuppers, conductor heads and downspouts.
h.Provide and install vapor retarder.
i.Specified 30-year Manufacturer’s Warranty
j.Provide all roof penetrations per Detail 3 on A-8.
k.Provide all roof specialties including coping, roof edge specialties, roof edge drainage system and reglets and counter flashing as specified.
The scope of work includes:
5.-07210 – Thermal Insulation
6.-07521 – SBS Modified Bituminous Membrane Roofing
7.-07710 – Roof Specialties
8.-07920 – Joint Sealants
Subcontractor to provide walkway pads as required by contract documents.
17.Subcontractor will provide daily protection of the roofing at the end of each shift.
18.Subcontractor to provide a new Styrene-butadiene-styrene (SBS) modified bituminous membrane roofing system as approved by owner on concrete deck including but not limited to:
a.All wood blocking required to complete roofing system.
b.All means of access and logistics for our work.
c.Fully adhere 2" Iso Base layer, and full ¼" tapered Iso (Min R11 – Min Avg R39)
d.Fully adhere ¼" Dens Deck Cover Board.
e.Fully adhere 2 Plies of Tremco’s PowerPly Endure 300 SBS Modified Bitumen System, granulated Cap Ply. Per RFI #59
f.Flash parapets with Tremco’s reinforced Alpha Guard Bio system.
g.Shop fabricate, and install all aluminum coping, counterflashing, scuppers, conductor heads and downspouts.
h.Provide and install vapor retarder.
i.Specified 30-year Manufacturer’s Warranty
j.Provide all roof penetrations per Detail 3 on A-8.
k.Provide all roof specialties including coping, roof edge specialties, roof edge drainage system and reglets and counter flashing as specified.
Budget: $350
Posted On: August 09, 2024 17:58 UTC
Category: CAD
Skills:Engineering & Architecture, Autodesk AutoCAD, Architectural Design, Drafting, 2D Design & Drawings, Engineering Design
Skills: Engineering & Architecture, Autodesk AutoCAD, Architectural Design, Drafting, 2D Design & Drawings, Engineering Design
Country: United States
click to apply